homepage water information doing business hot topics FAQs inside ose/isc jobs publications calendar links

1998-1999 Annual Report

Last Modified: 4/04/2000


Office of the State Engineer

Interstate Stream Commission

 

Cover: Acrylic on canvas Rio Puerco (detail) by Neal Townsend, 1997

 

 

 

 

 

Cover: Acrylic on canvas Rio Puerco (detail) by Neal Townsend, 1997

1998-1999 Annual Report


Table of Contents

  • Preparation of this report is required by law [NMSA 1978 Section 72-2-5 (1997)].
  • Message from the State Engineer
  • State of the State's Water Resources - Fiscal Year 1998-1999
  • Agency Overview
  • Administrative Services Division
  • Legal Services Division
  • Interstate Stream Commission
  • Technical Division
  • Water Rights Division
  • OSE Hearing Unit
  • Special Assistant on Indian Water Resources
  • Financial Reports
  • Appendix I: Narrative Summary of Status of Active Adjudications
  • Appendix II: ISC-Review of Basin Development Issues
  • Appendix III: ISC-Review of Endangered Species Issues
  • Appendix IV: ISC/OSE-Acequia Restoration Programs
  • Appendix V: Status of Hydrographic Surveys
  • Appendix VI: OSE and ISC Cooperative Projects with the USGS
  • Appendix VII: State Engineer-Natural Resources Conservation Service Cooperative Investigation Projects Watershed Protection and Flood Protection
  • Appendix VIII: Status of 1999 Regional Water Planning Contracts
  • Appendix IX: Regional Water Planning Table
  • Agency Phone Numbers & Addresses
  • Agency Staff
  • Acknowledgements

  •  
          GIS Maps      
               
     


    List of Figures

  • Figure 1 - First Four Months of Rocket Docket Program Disposition of 516 Pending Applications
  • Figure 2 - NM State Engineers-Terms of Office
  • Figure 3 - New Mexico Statewide Precipitation: 1998-99 compared with average (1898-1998)
  • Figure 4 - Department Organization
  • Figure 5 - Interstate Stream Commission Members Fiscal Year 1998-99
  • Figure 6 - Cumulative Change in Winter Flows in Three Reaches of the Rio Grande from 1944-96
  • Figure 7 - New Mexico's Rio Grande Compact Cumulative Delivery Departure
  • Figure 8 - Upper Rio Grande Basin
  • Figure 9 - Additions to Stateline Water Deliveries from Leases and Purchases through the Pecos River Conservation Program
  • Figure 10 - Regional Water Planning Areas
  • Figure 11 - Declared Groundwater Basins
  • Figure 12 - New Mexico Reservations and Pueblos
  • Figure 13 - Completed and Ongoing Adjudications
  • Figure 14 - Future New Mexico Adjudications
  • Figure 15 - Surface Basins

  • List of Tables

  • Table 1 - Dam Inspections
  • Table 2 - Number and Cost of Ditch Projects
  • Table 3 - Number of Subdivisions Reviewd
  • Table 4 - Square Miles in Declared Groundwater Basins
  • Table 5 - Well Drillers Licensed
  • Table 6 - Groundwater Documents Processed
  • Table 7 - Total Water Documents Processed
  • Table 8 - Surface Water Documents Processed During Fiscal Year 1998-99
  • Table 9 - Navajo Agricultural Products Industry
  • Table 10 - Acequias Assisted by ISC/OSE
  • Table 11 - Watershed Projects Status
  • Table 12 - Regional Water Planning Table

  • Fiscal Year 1998-99 Annual Report
    Of The Office Of The State Engineer

    Chris Nunn Garcia, Editor
    Design: Kenesson Design

    Web Page: Brent Pearce, Office of the State Engineer and
    Kenesson Design

    Cover: Acrylic on canvas by Neal Townsend, 1997
    Rio Puerco (detail)